Today, many residents of our country seek to leave the stuffy and noisy large cities and build their own spacious housing outside the city. But, unfortunately, only units can do this. This is what most people think. But this is not so. Thanks to modern technology, now many people know how to build a frame house. Moreover, for this you will not need to use expensive equipment and use the services of specialists. Everyone who does not even engage in construction professionally can build such a house on his own.
How to build a frame house with your own hands.
The advantage of the frame house is the speed of its construction. After all, only 3-4 people can build a quality house within a few months. The cost of its construction should also be clarified. They are minimal.
As for professional assistance, it will need it at the initial stage. Be sure to make an experienced people who know all the subtleties at home. If this does not suit you, you can use ready -made projects.
Well, let’s start. The most important thing in any building is the foundation. It is not particularly different from the usual. But so the frame house has less weight, the foundation is easiest to make from asbestos pipes. It should be remembered that the foundation should be accurately drawn and match the project. In addition to pipes, you also need cement, gravel and sand.
Then you should start building a floor. For this, it is necessary to lay out the boards that will determine the rooms and walls in the future house. Under them it is necessary to put roofing material. After that, all boards are impregnated with an antiseptic and dried. These boards must be fixed with anchor bolts. After that, it is necessary to build a base floor. The insulation should be laid on it, for example, mineral wool and cover everything with lags. It should be made sure that the last wooden layer of the floor corresponds to all the norms and indicators.
After that we start building walls. It is necessary to start with the construction of the lower binding. To do this, use special bars in which there are grooves. The distance between the grooves should exceed half a meter. Grooves are also used to connect bars.
Next, it is necessary to install the dug and smoothly move to the upper binding of the frame. You can use scarves that will temporarily fix the racks. The final stage is the fastening of the ceiling beams. At this pace, we smoothly move to the completion of the frame of the entire building.
After that, it is necessary to build a roof of the house and carry out finishing work. For the manufacture of the roof, it is necessary to prepare the rafters and carry out a crate. On top of it, it is necessary to lay roofing material, or other strong synthetic material. And then it is necessary to install either corrugated board, or metal tile or ordinary slate.
As for processing. The frame of the building must be treated with an antiseptic and allowed to dry out well. After that, it must be overtaken by OSB slabs. After that, you can finish the entire building with both siding and lining. Put the windows and doors. And the interior decoration must be started by stitching with mineral wool walls using mounting foam. Install all communication systems and sheathe them with drywall. For all other parts of the building, you can apply various finishing materials. Thus, you can independently build the perfect house in a small period of time for your family and loved ones.
We build a house with our own hands and on our own …