When building a house, before laying the foundation, you need to dig a pit. This is a pit in the ground under the foundation. Used to build a basement.
If you need to develop a pit with an excavator, then all services can be provided comprehensively. KVM company will take care of the disposal of land, outstay the foundation pit, take the ground and even wash the wheels at the exit from the construction site.
KVM company is engaged in the manufacture of both small foundations of 400-600 m3, for individual use, and large from 2000 to 10,000 m3. Small pits are made only in the Istra district. To do this, use the JCB JS 220 excavator or an excavator-loader JCB 3CX Super. You can order large pits in any area of Moscow or Moscow region.
In order to dig a pit for the construction of a house, such types of work are used:
A bulldozer, excavator or excavator-loader to the construction site are delivered.
The work of soil torn techniques is carried out.
Next are self -sides.
There is a disposal of dug soil.
Geodetic work is carried out.
Engineering work is carried out.
Dispatching technique control system.
Cleaning transport after operation.
Cleaning the construction site after work.
A contract is drawn up with the client, which displays the full cost of work for the volume of expense size. If you are trying to independently calculate the cost of a deep foundation pit, then do not forget to make fences or slopes to the estimate, for the need.
Also, it should be borne in mind that the land in a loosened state goes according to a coefficient of 1.3. This means that the breakdown of 1000 m3 of the land from the pit, in the dump truck it will already be 1300 m3.
Even a winter cold cannot stop work. You will be exposed to a pit in the frozen earth.
It is more profitable to immediately take a full range of work when developing a pit. After all, then you will not be faced with a mass of small problems that arise in such types of work. Here is a small list of factors that can affect the final cost of work, if you do not do it comprehensively:
Unstable weather conditions;
Unexpected transport breakdowns;
Different owners can not always work synchronously;
The need to independently decide where to put the land from the pit;
Dishonesty when loading a dump truck;
Incorrect accounting of the number of walkers;
Dispatcher errors.
Working with KVM, you can easily avoid all this.
In order for the work of dump trucks to be effective and safe, certain rules should be observed. Soil can only be loaded through the side or rear side. In no case should he be loaded through the cabin.
When work is underway to develop a pit, there should not be people on the construction site. The excavator driver is responsible for the process of loading a dump truck and soil development. And the master, surveyors and others perform coordinating actions when loading stopped.
Date of publication 2014-07-11