The Task of the Foundation Is Not Very Simple – It Shoup Withstand The Entire Extendation On the Soil. Therefore, Before Laying the Foundation, Geeological Studies Must Be Carried Out, and from the Indicators of the Soil Tests, it is Necessary to the Fundation Well Be. With a Weakened Bearing Capacy of the Earth, The Foundation Plate is Made, and with A Strong One, Its Necessary to Fill in the Strip Founding. The Foundation for a House Made of Aerated Concrede Doions Not the Best Option, If thes a Choice Between The Stove and the Strip Foundation, The Strip Will BE. It Willow You to Reduce Concrete Costs, Ordering Special Equipment and Reinforce.
Ribbon Monolithic Foundation
Preparation for a Strip Foundation Can Be Done Independently Or Hire Workers to Dig a Trench. The Trench SHOULD Be Approximatly Half a Meter in Depth. The be Sure to fall asleep on the Bottom of the Pit of the Pit, A Layer of 40-50cm and Tamp Well Well.
This is Done to Avoid Freezing and the Approach of Ground Water. AFTER that, A Classic FormWork with Filling and Reinforced is Creed, and The Foundation Is Poured with Concrete Solution.
Reinforced Concrete Slab
The Optimal Thickness of the Stove For The Foundation Is Approximatly 40cm. PLACE THIS: 10cm Plates Are Underground, and the Remaining 30cm on the Surface. At the Same Time, the IS No Need to Immeerse The Foundation Below The Depth of Freezing, But Good Drainage Is Required. It is Advisable to Lay Two Layers of WaterProProProProProfing Under Such A Foundation. The Next Action Will Be the Installation of Formwork, Reinforcesement and Pouring Concrete. The Concrete Itself Must Be Poured in Layers of 15cm and Aligned with a Chin Shovel.
In Order Not to Form Air Bubbles, From Time to Time, During the Pouring Process, It is Imperative to Bay A Bayonet Or A Steel Plate.
Picking Monolithic Foundation
This type of foundation is quite economical, but has a number of restrictions. IT Cannot Be Installed on the Ground, Inclined to Landslides, As Well as Loose Soils. The Technology for Creating Such a Foundation Is That The Pillars Are Driven Into The Ground 120-150mm Below The Lovel of Freezing. There shoup be no more than 2.5 m Between The Pillars, They Shoup Be Sticktly in the Corners of the Walls, In Order to Take on the Entire Load of the Building.
Pillars of Reinforced Concrete, Brick Or Stone Are Made. Installed Shoup Be Strictly in the Vertical Direction Without Slopes.
With Any Form of the Foundation, It Shoup Be Borne in Mind that Aerated Concrete is not Resistant to Absorption of Moisture, and it is necessary to very hign –quality waterprooproofing.
We Build a House From Foam Block. Wall Masonry, Foundation, Roof
Watch The Video: Preparation and Construction of a House from Arated Concrete. MP4
Watch Video: Home Foundation from Arated Concrete