Buying a good shower cabin is half. High -quality installation is very important to make it beautiful, even and nowhere. And the most important and complex in the process of installing the shower cabin is the installation of the pallet – it should stand in terms of horizontally and vertically.
Когда имеющийся поддон оборудован ножками, после установки по уровню его положение надо закрепить с помощью регулировочных винтов. If the pallet has no legs, then the floor is simply aligned with a cement screed, and then covered with ceramic tiles.
Acrylic pallets have features: should be in the presence of a leg in the center and two intersecting legs. But it happens that they are absent, then the pallet must be strengthened, otherwise it will fall under the weight of a bathing. To do this, make a base of concrete or a pillow of mounting foam, and then fasten. After installing the pallet, the installation of the shower cabin will go easier, t. to. The foundation has already been laid.
The next step in the assembly of the shower is connected to the rear wall of the cabin to the pallet. To do this, a sealant is applied to the junction and guide arcs are attached. Examine the work for places where water leaks that are carefully treated with sealant is possible. After that, they wait a day so that the seams are well dried up well, otherwise leaks cannot be avoided. After that, you can install equipment in the cabin. The equipment accessories are also carefully treated with sealant.
Connecting a shower cabin
After the installation of the shower is completed, the shower connection is followed to various systems: sewer, tap. If there is no access to centralized hot water supply, then it is possible to connect to a boiler system. Using a flexible hose with the corresponding shower connectors is connected to the water system. The minimum hose length should be from 150 cm. If there is less, then the difficulties associated with the planned maintenance and repair may arise in the future. In order to extend the service life of a shower, it is necessary to put cleaning filters on water pipes.
If there is a desire to put a cabin with hydromassage, then you need to find out the working pressure of the water in the house and compare with the parameters of the selected technique. Hydromassage acts only at a pressure of 1.5 bar.
Connecting to the sewage system, it is important to ensure that the pallet is installed above the level of the sewer pipe, otherwise the water drainage will be difficult. In addition, the sewer pipe is brought to the drain strictly at the installation site of the shower cabin.
If everything is done correctly and accurately, then the assembly of the cab is completed. The last bar is a check for the presence of leaks. If the water passage is detected, then they are again treated with sealant and given a day so that everything is dry.
The article is written in advance with the site –